Maintenance of Peeler Onion based on Efectiveness
Abstract
Full Text:
PDFReferences
K. Pertanian, Outlook Bawang Merah, Jakarta: Pusat Data dan Sistem Informasi Pertanian
Kementerian Pertanian, 2016.
H. Husniah, H. A. Maulana, U. S. Pasaribu and B. P. Iskandar, "Two-dimensional Lease Contract with Preventive Maintenance using Bivariate Weibull," International Journal of Industrial Engineering, vol. 26, no. 1, pp. 48-58, 2019.
K. Murata and H. Katayama, "Development of Kaizen Case-base for Effective Technology Transfer – A Case of Visual Management Technology," International Journal of Production Research, vol. 48, no. 16, pp. 4901-4917, 2010.
K. Matyas, T. Nemeth, K. Kovacs and R. Glawar, "A Procedural Approach for Realizing Prescriptive Maintenance Planning in Manufacturing Industries," CIRP Annals - Manufacturing Technology, pp. 1-4, 2017.
H. Pinto, C. Pimentel and M. Cunha, "Implications of Total Productive Maintenance in
Psychological Sense of Ownership," Social and Behavioral Sciences, vol. 217, p. 1076 – 1082,
S. Hashim, F. N. Habidin, J. Conding, A. F. Zubir and N. A. Jaya, "The Integrated Between Total Production Maintenance Practices and Kaizen Event Practices In Malaysian Automotive Industry," International Journal of Engineering Research and Applications, vol. 2, no. 5, pp.
-143, 2012.
M. Lewandowski and S. Oelker, "Towards Autonomous Control in Maintenance and Spare Part Logistics - Challenges and Opportunities for Preacting Maintenance Concepts," Procedia Technology, vol. 15, pp. 333-340, 2014.
M. Darghouth, D. Ait-kadi and A. Chelbi, "Joint Optimization of Design, Warranty and Price for Products Sold with Maintenance Service Contracts," Reliability Engineering and System Safety, vol. 165, pp. 197-208, 2017.
G. Ananth and B. Vinayagam , "Implementation and Fall of TPM in Micro Manufacturing Industries using SWOT Analysis-A Review," nternational Journal of Engineering and Innovative Technology (IJEIT), vol. 1, no. 4, pp. 109-113, 2012.
S. Panchali , "Total Productive Maintenance- A Tool for World Class Manufacturing,"
International Journal of Advanced, vol. 706, pp. 20-23, 2017.
X. Cao, C. Guo, H. Xiong, D. Li and X. Huang, "A Preventive Maintenance Model Subject to Sequential Inspection for a Three-Stage Failure Process," International Journal of Performability Engineering, vol. 15, no. 1, pp. 76-87, 2019.
A. Azizi, "Evaluation Improvement of Production Productivity Performance using Statistical Process Control, Overall Equipment Efficiency, and Autonomous Maintenance," Procedia Manufacturing, vol. 2, pp. 186-190, 2015.
J. Aizpurua, V. Cattersion, Y. Papadopoulus, F. Chiacchio and D. D'Urso, "Supporting Group Maintenance through Prognostics-enhanced Dynamic Dependability Prediction," Reliability Engineering and System Safety, pp. 1-18, 2017.
E. Karas, R. Smietanski and T. F. Cilan, "EMPLOYEES’ ASSESSMENT OF KAIZEN IMPLEMENTATION IN INDUSTRIAL ENTERPRISE – RESULTS OF EMPIRICAL RESEARCH," ACTA TECHNICA CORVINIENSIS, pp. 95-101, October 2016.
T. M. Aurel and T. Stefan , "CONTINUOUS QUALITY IMPROVEMENT IN MODERN ORGANIZATIONS TROUGH KAIZEN MANAGEMENT," in 9th Research/Expert Conference with International Participations, Neum, 2015.
S. Kumar, A. D. Dhingra and B. Singh, "Process Improvement Through Lean-Kaizen Using Value Stream Map: A Case Study in India," The International Journal of Advanced Manufacturing Technology, pp. 2687-2698, 2018.
H. Ishijima, E. Eliakimu and J. M. Mshana, "The “5S” Approach to Improve a Working
Environment can Reduce Waiting Time," The TQM Journal, vol. 28, no. 4, pp. 664-680, 2015.
Refbacks
- There are currently no refbacks.